Training Notes for Protool
Configuration
Contents
Document History *
1 Overview *
1.1 Introduction *
2 Creating a New Project *
3 Copying from PC to the Operator Panel *
3.1 Downloading Problems *
3.2 Putting the OP/TP into Transfer Mode *
3.2.1 Entering Transfer mode by selecting "serial download" *
3.2.2 Entering Transfer mode by selecting "MPI download" *
3.2.3 Entering Transfer mode by Rebooting *
3.3 Connecting using the S5 Cable *
3.4 Connecting using the MPI port *
3.5 Internal Download errors *
4 Main Project Window *
5 Configuring the Communication Link to the PLC *
6 Changing the Start Screen *
7 Touch Screens *
7.1 Changing Pages *
|
Revision |
Comments |
Date |
|
0.0 |
Initial Internal Issue |
27th January 2000 |
|
0.1 |
Initial Client Issue |
31st January 2000 |
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
This document details configuration and transfer of the Siemens Operator Panels using the Protool Software (v5.01)
Select File, New
You must now select the correct operator panel

Select the correct display in the wizard box as shown below:
Check the image displayed on the left matches your panel!
The protocol must now be selected

Clicking on the ‘Paremeters’ button will allow configuration of the PLC parameters:

These parameter vary from OP to TP (etc) so careful analysis of the parameters is required!
The default for MPI is the panel is node 1 and the PLC is node 2
In the last wizard box, selecting the ‘standard peoject’ is useful to generate quick projects!

Connect using
The port type is selected under
File, Settings, Download
The actual transfer is performed by selecting ‘Download’ from the file menu - this is a sadly confusing term (especially if you use the internet!).
Remember: You MUST put the OP into Transfer Mode
You should normally get something like this:
Select OK and then you should see something like this:

Downloading of the firmware always takes a long time (try not to do it too often!)
This is (eventually) followed by:
"Downloading Configuration"
and hopefully...
"Download complete successfully"
If you have problems, try:
Change the baud rate to 9600 (the default is 57K Baud).
Check the COM port is correct
Check you have the correct connection type selected
If you get "No connection to the OP" remember
You MUST put the OP into Transfer Mode
The panel will automatically go into transfer mode ‘out of the box’
You can program a ‘transfer mode’ button into the OP/TP (highly recommended during commissioning, since this reduces ‘download’ times to a few seconds instead of a few minutes), otherwise you will have to reboot as in the next section.
This is done by default (in the project wizard) and the relevant key is found on the "System Settings" screen
You can program an ‘MPI transfer mode’ button into the OP/TP (highly recommended during commissioning, since this reduces ‘download’ times to a few seconds instead of a few minutes), otherwise you will have to reboot as in the next section.
This is done by default (in the project wizard) and the relevant key is found on the "System Settings" screen
Reboot the OP/TP if necessary and press
Esc, Right & down
all at the same time within a few seconds (obvious, really....)
If requested, press DEL to erase the internal Flash.
This is simple but slow
You must select the COM port connection (File, Settings, Download)
Select 38400 baud
Select 19200 baud if it fails.
Select 9600 baud if that fails.
This is more complex – at least there are many more things to go wrong!
You must select the MPI connection (File, Settings, Download)
You must have the S7 PLC programming software installed
You must have an MPI cable (aka PC Adapter)
You must set up the tiny DIP switch on the side of the MPI cable correctly
You must set up the ‘max nodes on network’ correctly, both in the S7 programming software and the Protool Software.
If you start getting "internal download" errors, then try:
Make sure you are not plugged into the IF1A port!
If nothing else succeeds, reboot and start again
This is the main project window:

Most of the configuration of the project is done from this window.
Right click on the relevant items and click ‘insert Object’ to add a new item.
This should be done under "Controllers " of the main window,
Select Controller
Double click on the existing PLC
select parameters

This is under Edit, Properties – click on the little tick to select the current screen as the start screen:

The main difference with touch screens is as follows:
To change pages use:
Insert, Button
Note that this command is not available on the OP range (since you cannot have a touch button!)